The first part of the Main Building Roof goes on |
01 The volunteer... | 02 The volunteer... | 03 The Sissilati... | 04 Daniel builds... | 05 Attaching the... | 06 Attaching the... |
Once the main work started on the roof, things went quickly. A big blow was that the original plastering on most of the main building was very poor and had to be re-done at a cost of an unplanned K1,000,000 = about $400 = about £200.